BIM Case Study: How BIM Shaped the Shanghai Tower, China

The Shanghai Tower is not only the tallest building in China but also a symbol of engineering excellence and sustainable design. Standing at 632 meters with 128 stories, it’s the second tallest building in the world. A project of this scale demanded cutting-edge technology, and Building Information Modeling (BIM) played a pivotal role in turning this vision into reality.

Shanghai Tower China BIM case study showcasing sustainable skyscraper design

About the Project

  • Location: Shanghai, China
  • Height: 632 m, 128 floors
  • Completed: 2015
  • Architects: Gensler (design architect), Tongji Architectural Design Institute (local design institute)
  • Function: Mixed-use skyscraper (offices, hotels, retail, and observation decks)
  • Highlight: Twisting double-skin façade with world-class sustainable systems

The Shanghai Tower was designed to be an icon of sustainability, efficiency, and advanced engineering. From planning to construction, BIM technology was deeply integrated into every stage.


Role of BIM in Shanghai Tower

1. Managing the Complexity of Design

The spiral double-skin façade is one of the tower’s most iconic features.

  • BIM enabled precise 3D modeling of the twisting geometry.
  • Allowed the design team to simulate wind performance and ensure façade stability.
  • Helped avoid geometric conflicts in structural and MEP systems.

2. Clash Detection & Multi-Disciplinary Coordination

With hundreds of contractors and consultants involved, clashes were inevitable. BIM helped by:

  • Running clash detection models to identify conflicts between steel structures, elevators, HVAC, and plumbing systems.
  • Preventing costly reworks by resolving issues digitally before construction.
  • Streamlining coordination across architecture, structure, and MEP teams.

3. Construction Scheduling & Simulation (4D BIM)

The construction of the Shanghai Tower involved multiple phases and thousands of workers.

  • BIM’s 4D simulation allowed planners to align scheduling with real-time construction.
  • Visualized workflows helped ensure safety and efficiency on site.
  • Reduced delays by optimizing construction sequencing.

4. Cost Management & Resource Optimization (5D BIM)

With a budget of billions of dollars, cost accuracy was crucial.

  • BIM integrated cost estimation (5D BIM) to track resources.
  • Helped forecast material needs, reducing waste and improving procurement planning.
  • Ensured budget control without compromising design quality.

5. Sustainability & Energy Efficiency

Sustainability was a core goal of the Shanghai Tower. BIM contributed by:

  • Running energy simulations to test natural ventilation and lighting systems.
  • Supporting the integration of renewable energy sources and water recycling systems.
  • Helping the tower achieve LEED Platinum certification.

6. Facility Management & Digital Twin

Even after construction, BIM continues to benefit the Shanghai Tower.

  • A digital twin was created to manage building systems in real-time.
  • Facility managers use BIM for maintenance planning, energy monitoring, and safety checks.
  • Ensures efficient operations for decades to come.

Why This Project Matters

The Shanghai Tower stands as a global benchmark for BIM adoption in supertall buildings. It proved that BIM is not just about design but also about cost efficiency, sustainability, and lifecycle management.

  • Reduced construction risks through advanced simulations.
  • Improved cross-disciplinary collaboration on one of the world’s most complex skyscrapers.
  • Demonstrated BIM’s power in creating smart, sustainable megastructures.

Final Thoughts

The Shanghai Tower showcases the transformative power of BIM in managing scale, complexity, and sustainability. For AEC professionals, it’s a case study in how digital workflows turn engineering challenges into groundbreaking achievements.

As cities aim for smarter and greener skyscrapers, the Shanghai Tower remains a shining example of how BIM enables the future of construction.