{"id":314,"date":"2025-08-23T06:15:37","date_gmt":"2025-08-23T06:15:37","guid":{"rendered":"https:\/\/bimtraining.institute\/blog\/?p=314"},"modified":"2025-08-23T06:15:38","modified_gmt":"2025-08-23T06:15:38","slug":"what-is-lod-and-loi-in-bim","status":"publish","type":"post","link":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/","title":{"rendered":"What Is LOD and LOI in BIM?"},"content":{"rendered":"\n<p><em>A complete, plain-English guide to Levels of Development\/Detail &amp; Levels of Information<\/em><\/p>\n\n\n\n<p>Building Information Modeling (BIM) only delivers real value when everyone agrees <strong>how detailed<\/strong> the model needs to be and <strong>what information<\/strong> each element must contain\u2014<strong>at each stage<\/strong> of a project. That\u2019s exactly what <strong>LOD<\/strong> and <strong>LOI<\/strong> solve.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5-1024x1024.jpg\" alt=\"What is LOD and LOI in BIM? | Understanding Key BIM Concepts\" class=\"wp-image-315\" style=\"width:489px;height:auto\" srcset=\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5-1024x1024.jpg 1024w, https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5-300x300.jpg 300w, https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5-150x150.jpg 150w, https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5-768x768.jpg 768w, https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>This guide explains what LOD and LOI mean, how different standards use them, the practical differences between the two, and how to specify them on real projects (with examples and a ready-to-copy checklist).<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Quick definitions (without the jargon)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>LOD<\/strong><br>Depending on the standard you follow, LOD can mean:\n<ul class=\"wp-block-list\">\n<li><strong>Level of Development<\/strong> (BIMForum\/US usage): how <strong>reliable<\/strong> and <strong>constructible<\/strong> an element is (100 \u2192 500).<\/li>\n\n\n\n<li><strong>Level of Detail\/Definition<\/strong> (UK usage): the <strong>geometric detail<\/strong> of an element (often paired with LOI).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>LOI \u2013 Level of Information<\/strong><br>The <strong>non-geometric data<\/strong> attached to model elements: specifications, performance data, classifications, costs, serial numbers, maintenance fields, etc.<\/li>\n<\/ul>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Think of <strong>LOD<\/strong> as \u201cwhat it looks like and how accurately it\u2019s modeled,\u201d and <strong>LOI<\/strong> as \u201cwhat it <strong>knows<\/strong> about itself.\u201d<\/p>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why both are necessary<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A highly detailed 3D component with <strong>no attributes<\/strong> is pretty but <strong>useless<\/strong> for quantities, procurement, or FM.<\/li>\n\n\n\n<li>A component packed with attributes but <strong>poor geometry<\/strong> won\u2019t coordinate or fabricate well.<\/li>\n\n\n\n<li>Clear LOD\/LOI targets prevent scope creep, rework, bloated files, and arguments over \u201cwhat\u2019s included.\u201d<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The LOD scale at a glance (BIMForum\/US)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>LOD<\/th><th>What it means (short)<\/th><th>Typical use<\/th><\/tr><\/thead><tbody><tr><td><strong>100<\/strong><\/td><td>Conceptual massing, approximate size\/position<\/td><td>Feasibility, early options<\/td><\/tr><tr><td><strong>200<\/strong><\/td><td>Generic elements with approximate geometry<\/td><td>Scheme design, studies<\/td><\/tr><tr><td><strong>300<\/strong><\/td><td>Accurate size\/shape\/location; ready for coordination<\/td><td>Detailed design, approvals<\/td><\/tr><tr><td><strong>350<\/strong><\/td><td>Includes interfaces\/clearances and supports<\/td><td>Trade coordination, clash resolution<\/td><\/tr><tr><td><strong>400<\/strong><\/td><td><strong>Fabrication level<\/strong>; includes connections and spools<\/td><td>Shop drawings, prefabrication<\/td><\/tr><tr><td><strong>500<\/strong><\/td><td><strong>As-built verified<\/strong><\/td><td>Handover, operations &amp; maintenance<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>In the <strong>UK<\/strong>, you\u2019ll often see <strong>LOD (geometry)<\/strong> and <strong>LOI (information)<\/strong> used together to describe the \u201cLevel of Definition.\u201d<\/p>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">LOI: what information is expected?<\/h2>\n\n\n\n<p>LOI is task-driven. Examples of data fields you might require:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Design<\/strong>: fire rating, U-values, acoustic ratings, flow rates, loads, power.<\/li>\n\n\n\n<li><strong>Procurement<\/strong>: manufacturer, model, lead times, unit rates, warranty terms.<\/li>\n\n\n\n<li><strong>Construction<\/strong>: fixings, installation guides, approvals, method statements.<\/li>\n\n\n\n<li><strong>Handover\/FM<\/strong>: serial numbers, spare parts, O&amp;M links, maintenance cycles, location codes, barcodes\/QRs.<\/li>\n<\/ul>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>ISO 19650 encourages describing this as a <strong>Level of Information Need<\/strong>\u2014the <strong>minimum<\/strong> information required for a decision or delivery at a particular stage.<\/p>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">LOD vs LOI (the difference in one minute)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>LOD (geometry)<\/strong> answers: <em>How accurately is this modeled? Can I coordinate or fabricate from it?<\/em><\/li>\n\n\n\n<li><strong>LOI (data)<\/strong> answers: <em>What do I need to know about it to design, buy, install, operate, or maintain it?<\/em><\/li>\n<\/ul>\n\n\n\n<p><strong>Example \u2013 Door<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>LOD 300<\/strong>: Exact size, swing, frame profile placed accurately in the wall.<\/li>\n\n\n\n<li><strong>LOI for design<\/strong>: Fire rating, acoustic class, vision panel spec.<\/li>\n\n\n\n<li><strong>LOD 400<\/strong>: Manufacturer-specific geometry including hinges\/closers.<\/li>\n\n\n\n<li><strong>LOI for procurement\/FM<\/strong>: Model code, finish, hardware set, warranty, serial number, maintenance interval.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Worked examples (copy these patterns)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1) Air Handling Unit (AHU)<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>RIBA Stage 3 \/ LOD 300<\/strong>: Accurate footprint, connections, access zones.<br><strong>LOI<\/strong>: Duty\/standby, airflow (CFM), external static pressure, power, sound.<\/li>\n\n\n\n<li><strong>Pre-construction \/ LOD 350\u2013400<\/strong>: Lifting points, exact nozzle sizes, maintenance clearances.<br><strong>LOI<\/strong>: Manufacturer, model, weight, electrical requirements, lead time, cost code.<\/li>\n\n\n\n<li><strong>Handover \/ LOD 500<\/strong>: Verified geometry\/location.<br><strong>LOI<\/strong>: Serial number, O&amp;M manual link, filter sizes, maintenance plan (e.g., quarterly).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2) Steel Beam<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>LOD 300<\/strong>: Correct size\/grade, camber, location.<br><strong>LOI<\/strong>: Section type, grade, fire protection requirement.<\/li>\n\n\n\n<li><strong>LOD 400<\/strong>: Connection plates, bolt sizes, holes, weld symbols.<br><strong>LOI<\/strong>: Fabricator, coating system, piece mark, pack list reference.<\/li>\n\n\n\n<li><strong>LOD 500<\/strong>: As-built survey alignment.<br><strong>LOI<\/strong>: Inspection certificate, test results, warranty.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">A simple LOD\/LOI matrix you can paste into your BEP<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Element Category<\/th><th>Stage<\/th><th>LOD (Geom)<\/th><th>LOI (Data fields \u2013 minimum)<\/th><th>Responsible Party<\/th><th>Validation<\/th><\/tr><\/thead><tbody><tr><td>Doors (A)<\/td><td>Design<\/td><td>300<\/td><td>Size, fire\/acoustic rating, material, hardware set ID<\/td><td>Architect<\/td><td>Model check + schedule review<\/td><\/tr><tr><td>Doors (A)<\/td><td>Procure<\/td><td>350\/400<\/td><td>Manufacturer, model, finish, cost code, lead time<\/td><td>Contractor<\/td><td>Submittal approval<\/td><\/tr><tr><td>Doors (A)<\/td><td>Handover<\/td><td>500<\/td><td>Serial no., warranty, O&amp;M link, space code<\/td><td>Contractor\/FM<\/td><td>Field verify + COBie check<\/td><\/tr><tr><td>Ducts (M)<\/td><td>Coord.<\/td><td>350<\/td><td>System, size, insulation, pressure class<\/td><td>MEP<\/td><td>Clash report pass<\/td><\/tr><tr><td>Ducts (M)<\/td><td>Fab<\/td><td>400<\/td><td>Spool\/segment IDs, connectors, supports<\/td><td>Fabricator<\/td><td>Shop drawing approval<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong>Tip:<\/strong> Tie LOI to a classification (Uniclass, OmniClass, MasterFormat) so schedules and exports stay consistent.<\/p>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">How to specify LOD\/LOI on your project (5 steps)<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Choose your framework and say it out loud.<\/strong><br>In the BEP, state whether you\u2019re using <strong>BIMForum LOD<\/strong> (US), <strong>Level of Definition (UK LOD+LOI)<\/strong>, or an <strong>ISO 19650 Level of Information Need<\/strong> approach (recommended for modern contracts).<\/li>\n\n\n\n<li><strong>Define by purpose, not by habit.<\/strong><br>For each <strong>decision\/delivery<\/strong>, define the <strong>minimum<\/strong> geometry + data needed. Don\u2019t over-model.<\/li>\n\n\n\n<li><strong>Create an Element Responsibility Matrix.<\/strong><br>Who owns what, when, and to what LOD\/LOI? Note <strong>authoring software<\/strong> and <strong>exchange formats<\/strong> (e.g., RVT, NWC, IFC).<\/li>\n\n\n\n<li><strong>Plan validation.<\/strong>\n<ul class=\"wp-block-list\">\n<li>Geometry: clash tests, clearance rules, model health checks.<\/li>\n\n\n\n<li>Data: property set rules, required field checks, COBie exports, ID\/QR verification.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Lock it into your CDE workflow.<\/strong><br>Use WIP \u2192 Shared \u2192 Published gates; refuse uploads that fail the LOD\/LOI checks.<\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Common pitfalls (and how to avoid them)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Mixing definitions<\/strong>: Saying \u201cLOD 400\u201d without stating which framework causes disputes.<br><em>Fix:<\/em> Cite the standard in the BEP and include a one-page legend.<\/li>\n\n\n\n<li><strong>Over-modeling<\/strong>: LOD 400 everywhere bloats files and time.<br><em>Fix:<\/em> Reserve LOD 400 for elements that <strong>must<\/strong> be fabricated\/prefabbed.<\/li>\n\n\n\n<li><strong>Under-specifying LOI<\/strong>: Great geometry, empty schedules.<br><em>Fix:<\/em> Tie LOI to decisions (tendering, ordering, FM), and make fields mandatory.<\/li>\n\n\n\n<li><strong>Late data<\/strong>: Trying to collect LOI at handover leads to gaps.<br><em>Fix:<\/em> Phase LOI delivery (design, procurement, install, validate).<\/li>\n\n\n\n<li><strong>No QA<\/strong>: Assuming authors will \u201cjust know.\u201d<br><em>Fix:<\/em> Automate checks using rule sets; fail uploads that don\u2019t comply.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Where LOD\/LOI really pay off<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Cost &amp; time<\/strong>: Reliable quantities and 4D\/5D planning reduce change orders.<\/li>\n\n\n\n<li><strong>Prefabrication<\/strong>: LOD 400 unlocks spooling, modular assemblies, and off-site manufacturing.<\/li>\n\n\n\n<li><strong>Safety &amp; access<\/strong>: LOD 350+ ensures real clearance zones and maintenance reach.<\/li>\n\n\n\n<li><strong>FM readiness<\/strong>: Correct LOI at LOD 500 delivers usable digital twins\/COBie.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ (30-second answers)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Is LOD 500 always required?<\/strong><br>No. Use it where <strong>as-built verification<\/strong> adds value (e.g., FM-critical assets).<\/li>\n\n\n\n<li><strong>Do I need LOD 400 for everything?<\/strong><br>No. Target <strong>fabricated elements<\/strong> (steel, ducts, MEP skids, fa\u00e7ades).<\/li>\n\n\n\n<li><strong>How does ISO 19650 change this?<\/strong><br>It promotes <strong>Level of Information Need<\/strong>\u2014define exactly what\u2019s needed, avoiding arbitrary \u201ceverything at 400.\u201d<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Takeaway<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>LOD = geometry reliability<\/strong>; <strong>LOI = data sufficiency<\/strong>.<\/li>\n\n\n\n<li>Specify both by <strong>stage and purpose<\/strong>, name your <strong>standard<\/strong>, and enforce with <strong>checks<\/strong>.<\/li>\n\n\n\n<li>Use <strong>LOD 400<\/strong> surgically for fabricated items; aim for <strong>LOI that matches decisions<\/strong> (design, buy, build, operate).<\/li>\n<\/ul>\n\n\n\n<p>With a clear LOD\/LOI strategy, your BIM model becomes a trustworthy engine for design coordination, procurement, construction, and facility management\u2014not just a 3D picture.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A complete, plain-English guide to Levels of Development\/Detail &amp; Levels of Information Building Information Modeling (BIM) only delivers real value [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-314","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What is LOD and LOI in BIM? | Understanding Key BIM Concepts<\/title>\n<meta name=\"description\" content=\"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is LOD and LOI in BIM? | Understanding Key BIM Concepts\" \/>\n<meta property=\"og:description\" content=\"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\" \/>\n<meta property=\"og:site_name\" content=\"EduCADD BIM Training Institute\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-23T06:15:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-23T06:15:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"support\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"support\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\"},\"author\":{\"name\":\"support\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/1e030f75be2f6c1d6e0dbfa0c9d62abb\"},\"headline\":\"What Is LOD and LOI in BIM?\",\"datePublished\":\"2025-08-23T06:15:37+00:00\",\"dateModified\":\"2025-08-23T06:15:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\"},\"wordCount\":1096,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg\",\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\",\"url\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\",\"name\":\"What is LOD and LOI in BIM? | Understanding Key BIM Concepts\",\"isPartOf\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg\",\"datePublished\":\"2025-08-23T06:15:37+00:00\",\"dateModified\":\"2025-08-23T06:15:38+00:00\",\"description\":\"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.\",\"breadcrumb\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage\",\"url\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg\",\"contentUrl\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg\",\"width\":1080,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bimtraining.institute\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Is LOD and LOI in BIM?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#website\",\"url\":\"https:\/\/bimtraining.institute\/blog\/\",\"name\":\"BIM Training Institute\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bimtraining.institute\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#organization\",\"name\":\"EduCADD\",\"url\":\"https:\/\/bimtraining.institute\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/07\/cropped-EduCADD-Logo-63955384-512d-45ef-b03c-55a42d020ffb-1.png\",\"contentUrl\":\"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/07\/cropped-EduCADD-Logo-63955384-512d-45ef-b03c-55a42d020ffb-1.png\",\"width\":331,\"height\":103,\"caption\":\"EduCADD\"},\"image\":{\"@id\":\"https:\/\/bimtraining.institute\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/1e030f75be2f6c1d6e0dbfa0c9d62abb\",\"name\":\"support\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1b43eb586030270585e01c4b38a188e1ae6f33e91a125e4c2466a46cd2f9ccad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1b43eb586030270585e01c4b38a188e1ae6f33e91a125e4c2466a46cd2f9ccad?s=96&d=mm&r=g\",\"caption\":\"support\"},\"sameAs\":[\"https:\/\/bimtraining.institute\/blog\"],\"url\":\"https:\/\/bimtraining.institute\/blog\/author\/support\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is LOD and LOI in BIM? | Understanding Key BIM Concepts","description":"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/","og_locale":"en_US","og_type":"article","og_title":"What is LOD and LOI in BIM? | Understanding Key BIM Concepts","og_description":"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.","og_url":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/","og_site_name":"EduCADD BIM Training Institute","article_published_time":"2025-08-23T06:15:37+00:00","article_modified_time":"2025-08-23T06:15:38+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg","type":"image\/jpeg"}],"author":"support","twitter_card":"summary_large_image","twitter_misc":{"Written by":"support","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#article","isPartOf":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/"},"author":{"name":"support","@id":"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/1e030f75be2f6c1d6e0dbfa0c9d62abb"},"headline":"What Is LOD and LOI in BIM?","datePublished":"2025-08-23T06:15:37+00:00","dateModified":"2025-08-23T06:15:38+00:00","mainEntityOfPage":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/"},"wordCount":1096,"commentCount":0,"publisher":{"@id":"https:\/\/bimtraining.institute\/blog\/#organization"},"image":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage"},"thumbnailUrl":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg","articleSection":["Blog"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/","url":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/","name":"What is LOD and LOI in BIM? | Understanding Key BIM Concepts","isPartOf":{"@id":"https:\/\/bimtraining.institute\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage"},"image":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage"},"thumbnailUrl":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg","datePublished":"2025-08-23T06:15:37+00:00","dateModified":"2025-08-23T06:15:38+00:00","description":"Learn the difference between LOD (Level of Detail\/Development) and LOI (Level of Information) in BIM. Discover how these concepts works.","breadcrumb":{"@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#primaryimage","url":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg","contentUrl":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/08\/BIM-Blog-post-5.jpg","width":1080,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/bimtraining.institute\/blog\/what-is-lod-and-loi-in-bim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bimtraining.institute\/blog\/"},{"@type":"ListItem","position":2,"name":"What Is LOD and LOI in BIM?"}]},{"@type":"WebSite","@id":"https:\/\/bimtraining.institute\/blog\/#website","url":"https:\/\/bimtraining.institute\/blog\/","name":"BIM Training Institute","description":"","publisher":{"@id":"https:\/\/bimtraining.institute\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bimtraining.institute\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bimtraining.institute\/blog\/#organization","name":"EduCADD","url":"https:\/\/bimtraining.institute\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bimtraining.institute\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/07\/cropped-EduCADD-Logo-63955384-512d-45ef-b03c-55a42d020ffb-1.png","contentUrl":"https:\/\/bimtraining.institute\/blog\/wp-content\/uploads\/2025\/07\/cropped-EduCADD-Logo-63955384-512d-45ef-b03c-55a42d020ffb-1.png","width":331,"height":103,"caption":"EduCADD"},"image":{"@id":"https:\/\/bimtraining.institute\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/1e030f75be2f6c1d6e0dbfa0c9d62abb","name":"support","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bimtraining.institute\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1b43eb586030270585e01c4b38a188e1ae6f33e91a125e4c2466a46cd2f9ccad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1b43eb586030270585e01c4b38a188e1ae6f33e91a125e4c2466a46cd2f9ccad?s=96&d=mm&r=g","caption":"support"},"sameAs":["https:\/\/bimtraining.institute\/blog"],"url":"https:\/\/bimtraining.institute\/blog\/author\/support\/"}]}},"_links":{"self":[{"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/posts\/314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/comments?post=314"}],"version-history":[{"count":1,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/posts\/314\/revisions"}],"predecessor-version":[{"id":316,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/posts\/314\/revisions\/316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/media\/315"}],"wp:attachment":[{"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/media?parent=314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/categories?post=314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bimtraining.institute\/blog\/wp-json\/wp\/v2\/tags?post=314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}